This 5 year contract requires FRASEC VENTURES CORPORATION to provide the manpower, technical expertise and equipment compliment for the drilling, blasting, Quarrying/ Mining of Limestone, Shale, and Silica at a total monthly volume of 25,000 tons. FRASEC Ventures Corporation is also tasked to undertake mine road maintenance, waste dump and silt pond maintenance and Mine Planning and Design in coordination with PACEMCO technical staff on subsequent production operations.
|
|
|
|
|
|
|
|
|
|
|
Cabangahan, Cantilan, Surigao del Sur
Riding on the expected rise in the price of nickel in the world market today, Marcventures Mining and Development Corporation (MMDC) invited FRASEC Ventures Corporation, a fast rising key player in the mining industry today that offers basically all mining services from mine development to exploitation, to develop for Nickel its high-grade nickel MPSA property located in Cabangahan, Cantilan, Surigao del Sur. For FRASEC, this project is a mega project with good prospects comparable with its existing mining projects: Carmen Copper Corporation in Toledo City, Cebu (formerly Atlas Mining and Development Corporation) for Copper; Philnico Nickel Project in Nonoc Island for Nickel; Wellex Mining Chromite Project in Libjo, Dinagat Islands for Chromite; and Pacific Cement Corporation (PACEMCO) in Surigao City for Cement. For MMDC, FRASEC started building haulage and mine roads, stockyards, settling ponds and a jetty in the third week of April 2009 with target completion on May 31, 2009.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ATOMED & AJINOMOTO CEBU PLANT (MEPZ 2) -
Basak, Lapulapu City, Cebu
ATOMED Plant (April – September 2004)
- Site Clearing/Preparation & Earthworks & Soil Filling
- Factory Building Formworks
- Factory Rebar Works
- Road Construction of Sinulog Drive (MEPZ 2)
- Perimeter Fencing
|
AJINOMOTO Plant (March – May 2004)
- Pahiyas Drive Drainage System
- Construction of Roads, Curbs and Gutter
- Perimeter Fence
|
|
|
|
|
|
|
|
|
CEMEX Philippines - Tina-an, Cebu
- Design & Construction of Empty Bag Transport System
- Road Concreting to APO Port
- Drainage System Construction to Port Area
- Construction of APO Haulers Parking Area
- Jetty Platform Construction
- B.O. Cement Recycling Project
- Hazard Elimination projects for Limestone Conveyor, Crusher Conveyor to Transfer Tower
- Environmental and Safety Projects – Road Pavement and Perimeter Fence Repairs
- Design and Construction of Oil & Lubricant Warehouse
|
- Yearly Plant Wide Air Conditioning Maintenance of Years 2001 and 2002
- Multi Purpose Building Site Dev Works
- Multi Purpose Building Children’s Playground
- Safety Hazard Elimination Project
- Design & Construction of Spare Parts Warehouse
- Improvement of Fire Hydrant Pump to Conform with FM Global Standards 2001
- Fabrication & installation of exhaust ducting at DOPOL Fan and APO-1 Kiln drive panels
- Construction of Coal & Gypsum Containment Yard
|
|
|
|
|
|
|
|
|
Corona del Mar Land Development - Talisay, Cebu
» Sub-contracting works for Anseca - Acelco
Ventures Inc. in the land development with
removal of unsuitable materials.
» Land Filling of an approximate volume of
500,000 cubic meters of coralline limestone
and engineer filling of up to 95%-100%
compaction on a 35-hectare area by the
beach.
» Construction of Road network, drainage
system, water line system and sewer system.
Completed Projects:
- Phase 1 - Engineered Back filling of Spine Road to Beach Front (1998 – 2000)
- Phase 2A - Landfilling of blocks at Ph. 1A and Beachfront Area (2000 – 2001)
- Phase 2B – Partial Land Development of Ph1B, Road Construction of Ph 1 A & Land filling of Staging Area for Model House (2001 – 2002)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|